Client | Scope of Work |
KPE Contract 423 Project | Micro Chipping Concrete Grouting |
Contract 859A – HarbourFront | Micro Chipping Concrete Grouting |
Interchange Station Box Project | PU Grouting |
Contract 851A – CCL 3 | Shotcreting PU Grouting |
Contract 853 – Bishan MRT | PU Grouting |
Contract 825 | Gel Grouting Under Water Cementitious Grouting PU Grouting |
Circle Line Contract 822 | Gel Grouting PU Grouting |
Contract 824 (Nicoll Highway) | PU Grouting Foam Grouting |
Contract 855 – CCL 4 & 5 | Gel Grouting PU Grouting |
Contract 703 | Chemical grouting |
Contract 704 | Chemical grouting |
Contract 706 | Chemical grouting |
Contract 708 | Chemical grouting |
Contract 709 | Chemical grouting |
Contract 310 – Marina Bay – 1st Phase of MRT Lines | Grouting to leakages on cofferdams, tunnels segment, segment joints, leaking concrete structures and track base for waterproofing effect. |
Contract 854 | Chemical grouting – NS grout |
Contract 912 | Grouting injection – twin line pump or Traiver Gold 4200 pump |
Contract 913 | PU Grouting |
Contract 917 | PU Grouting |
Contract 916 | Chemical grouting – NS grout |
Contract 920 | PU Grouting |
Contract 915 | Chemical grouting – NS grout |
Contract 927 | PU Grouting |
Contract 928 | Chemical grouting at tunnel precast segment |
Contract 929A | Chemical grouting to tunnel areas |
Contract 930 | Chemical grouting at tunnel precast segment |
Contract 932 | Chemical grouting – TBM machine gap areas |
Contract 937 | PU Grouting to base slab and tunnel segment |
Contract T211 | Chipping Concrete Pressure Grouting |
Contract T212 | Grouting with MC-Injekt 2700 wall area Chemical grouting MC Injekt 2033 to repair water leakages at honeycomb bare pipe |
T226 Marina Bay Station (Thomson Line) | Pressure grouting of non-shrink grout to soffit |
Client | Scope of Work |
Deep Tunnel Sewerage System (Changi East) | Gel Grouting |
Deep Tunnel Sewerage System (Link Tunnel) | Gel Grouting |
Cable Tunnel EW3 | Chemical Grouting at cable tunnel precast segment |
Cable Contract EW3 | PU grouting at ring segment tunnel |
Cable Tunnel EW2 | Chemical Grouting to tunnel segment |
Cable Tunnel NS2 | PU Grouting at tunnel segment socket, crack and joint |
Senoko-Woodlands-Gambas And Labrador- Harbour Drive Tunnels | Chemical Grouting to precast segment at lifting socket, segment joint and segment crack |
SP Cable EW1 (Ayer Rajah) | PU Grouting Gel Grouting |
Cable Tunnel Contract (EW3) Tai Seng Station | Grouting with “GreenFlex 200” flexi gel grout at diaphragm wall |
Contract ER 382 | Pressure grouting of non-shrink grout with or without pre-packed aggregates at wall |